
This museum located at the top of the hill at the heart of the town.


This is the first well called 'The Grand Oil Lady' and the first driller that they use to drilled the oil at the top of Canada Hills.
The First oil well in Malaysia drilled by cable tool method
Spudded in : 10 August 1910
Completed : 22 December 1910
Original depth : 452 feets
Last Production depth : 1096 depth
Abonded : 31 October 1972
Estimate total Production : 660,000 barrels
Last production rate : 7 barrels per day
Total of wells in Miri field : 624
Total production in Miri field : 80 millions barrels.


Time Capsule:- Kapsul masa ini mengandungi buku cendaramata perisytiharaan Bandaraya Miri, surat khabar tempatan dan berbagai documen bercetak yang akan dibuka dengan rasminya pada 20hb Mei 2105.

View from the top of the hills. Greeennnnn............





The tree and the flowers.


And the Guards!!!

No comments:
Post a Comment
tq, peace :)